PT PortuguêsMeet us in BarcelonaMeet us

The next six hours of the river, with the uncertainty attached.

GeoAlerta AI Sul turns river gauges, rain, terrain and population data into one traceable picture for municipal flood teams. It is being built and tested in Lajeado and Estrela, southern Brazil, where the Taquari river rose above 30 metres in May 2024.

We’ll be in Barcelona looking for new business.

Smart City Expo World Congress, 3–5 November 2026, Fira Gran Via

111213141516171819202122232425262728293031May 2024, 30 m+Flood stage, 19 mNormal level, ~13 m111213141516171819202122232425262728293031

In May 2024 the water rose faster than the evidence could be put together.

The data existed: river gauges, rain stations, satellites, risk maps, census tracts. It sat in different systems, at different update rates, with different reliability. Municipal teams had to combine it by hand, under pressure, at night.

  • 478of 497 municipalities in Rio Grande do Sul were affected1
  • 2 million+people were affected and more than 180 lost their lives1
  • 30 m+on the Taquari gauge at Lajeado and Estrela, the highest on record. Flood stage is 19 m.2

One evidence layer. People make the decisions.

Every number on screen carries its source, its age and its uncertainty. When critical data is missing or late, the system says so instead of guessing.

  1. Collect

    31 catalogued sources: SGB and ANA river gauges, Civil Defense sensors, GOES-19 and CPTEC rain, ECMWF ensembles, SAR coverage, IBGE census, terrain.

  2. Check

    Late, future, duplicated or inconsistent readings are rejected. Missing data is never turned into zero.

  3. Estimate

    A hybrid model forecasts the river level 1 to 6 hours ahead, with a 90% interval and the chance of crossing 19 m.

  4. Prioritise

    The forecast is crossed with official risk sectors, terrain, population and hospitals, so teams see who may be exposed first.

Tested against four real floods it had never seen.

We trained on three floods and tested on the fourth, then rotated: September 2023, November 2023, May 2024 and June 2025. The chart compares average forecast error with the simplest alternative, assuming the river stays where it is.

Average error of the river-level forecast, in metres
Forecast error by horizon
h aheadGeoAlertaRiver stays where it isFloods caught
1 h8 cm28 cmFloods caught 99.6%
2 h18 cm56 cmFloods caught 96%
3 h29 cm84 cmFloods caught 94%
4 h40 cm112 cmFloods caught 92%
5 h53 cm140 cmFloods caught 89.4%
6 h69 cm168 cmFloods caught 85.9%

Up to 3 hours ahead the model caught at least 94% of flood-stage moments in every test flood. At 5–6 hours that drops to 86%, so those horizons support human screening only. The 24-hour horizon stays blocked. This is retrospective research evidence, not operational validation.

Pilot: Lajeado and Estrela, Vale do Taquari.

Planning-scenario estimates from the current release (v0.50.1). They describe exposure to plan for, not people confirmed in danger.

  • 41,950people potentially exposed in the planning scenario
  • 2,215priority population cells from the 2022 census grid
  • 57official SGB high and very-high risk sectors, field-updated in 2025
  • 47official flood records since 1991 kept for validation, never as live input

Screens from the live experimental environment

Decision panel showing evidence status, river forecast window and source freshness for Lajeado and Estrela.
Decision panel. When the forecast is stale, no probability is shown.
Territorial map of Lajeado and Estrela with official risk sectors, population cells and hospitals.
Territorial map with SGB risk sectors, population cells and hospitals.
Open the live experience

Safety is part of the product, not a disclaimer.

  • Missing or late critical data never becomes “zero risk”.
  • Uncertainty and the source of every value stay visible.
  • Physical hazard, exposure and response priority are kept apart.
  • Context sources never silently become an operational authority.
  • Warnings and evacuations stay with Civil Defense and the authorities.

GeoAlerta AI Sul is not an official public warning system. Public warnings, evacuation and road closures remain with Civil Defense and competent authorities.

Pitch deck

Ten slides, about four minutes. Use the arrows or your keyboard.

Climate resilience intelligence for cities, starting with river floods.

Evidence first. Uncertainty visible. Humans in control.

We’ll be in Barcelona looking for new business.

Smart City Expo World Congress, 3–5 November 2026, Fira Gran Via

111213141516171819202122232425262728293031May 2024, 30 m+Flood stage, 19 mNormal level, ~13 m
GeoAlerta AI Sul1 / 10

1 of 10

We are looking for partners to validate and scale it responsibly.

  • Municipal and regional pilots

    Cities exposed to river floods that want to test the method with their teams.

  • Pre-seed and seed investment

    ClimateTech, GovTech and impact investors backing validation milestones.

  • Non-dilutive funding

    Climate-resilience grants and public innovation programmes.

  • Cloud and GPU capacity

    Infrastructure credits for weather ensembles and geospatial AI.

  • Hydrology and weather data

    Gauge networks, radar and forecasts that strengthen the evidence.

  • Research partners

    Prospective validation with universities and research centres.

We’ll be in Barcelona looking for new business.

Smart City Expo World Congress, 3–5 November 2026, Fira Gran Via

Gilliard Leda, Founder | Data Scientist, Aggilli Intelligence